IMPROVING STUDENTS´ PROJECT MANAGEMENT SKILLS IN BIOMEDICAL ENGINEERING PROJECTS

IMPROVING STUDENTS´ PROJECT MANAGEMENT SKILLS IN BIOMEDICAL ENGINEERING PROJECTS

L. Ballesteros-Sánchez, R. Rodríguez-Rivero, A. Lantada, J. Ruíz, R. García, E. Tanarro, et al, et al, et al (2019).  IMPROVING STUDENTS´ PROJECT MANAGEMENT SKILLS IN BIOMEDICAL ENGINEERING PROJECTS . 12.

Earlier studies suggested the Project Management (PM) skills are core to the leadership attributes of engineers. Some interrelated research streams are available for an understanding of the challenges in teaching and learning both engineering and PM education. The need to teach and learn PM in engineering schools has been advanced by employers. Today, organizations expect engineers to excel in many soft skills, including teamwork and communication. They are keen to tap into these vital soft skills that they obtained during their studies and periods of work experience, rather than just degree-specific knowledge. In this study, an integrative Project-Based Learning (PBL) approach is presented. It is used in two courses devoted to the biomedical engineering field, namely “Bioengineering Design” and “MedTech”, included in the Master’s Degree in Industrial Engineering and in the Master’s Degree in Engineering Management, respectively, both at the ETSI Industriales from Universidad Politécnica de Madrid. These courses follow a framework completely aligned with the spirit of the International CDIO Initiative. Students from both courses collaborate in teams and live through the complete project life cycle of innovative medical devices. The PBL approach applied is aimed to allow students to learn basic PM skills such as technical, business, and human ones. From the beginning of the courses, students are provided with specific knowledge, tools, and exercises to improve their capabilities for building strong teams and achieving their project goals. By integrating PM deliverables (scope, time, cost, risk, quality and communication management) with team development strategies (team agreement, personality identification, competencies assessment, teambuilding, roles definition, and personal interviews) and specific soft skills workshops it has been possible to provide an effective learning experience for improving students PM skills. Main results, difficulties, benefits, and conclusions of the experience are presented in this work as well as lessons learned for the continuous improvement for the next courses. 

Authors (New): 
Luis Ballesteros-Sánchez
Rocío Rodríguez-Rivero
Andrés Díaz Lantada
Jesús Juan Ruíz
Rafael Borge García
Enrique Chacón Tanarro
Miguel Ángel Peláez García
Ana Moreno Romero
Rafael Ramos Díaz
Pages: 
12
Affiliations: 
Universidad Politécnica de Madrid (UPM), Spain
Keywords: 
CDIO as Context
Project based learning
Project management
skills
Biomedical Engineering
CDIO Standard 2
CDIO Standard 3
CDIO standard 4
CDIO Standard 7
CDIO Standard 8
Year: 
2019
Reference: 
Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruitment signals from job advertisements. Project Management Journal, 44(5), 36- 54.: 
Ashleigh, M., Ojiako, U., Chipulu, M., & Wang, J. K. (2012). Critical learning themes in project management education: Implications for blended learning. International Journal of Project Management, 30(2), 153-161.: 
Association for Project Management. (2008). APM competence framework. Buckinghamshire: Author. Australian Institute for Project Management. (2008). Professional competency standards for project management. Sydney: Author.: 
Berggren, C., Järkvik, J., & Söderlund, J. (2008). Lagomizing, organic integration, and systems emergency wards: innovative practices in managing complex systems development projects. Project Management Journal, 39(1_suppl), S111-S122.: 
Boyatzis, R. E. (1982). The competent manager: A model for effective performance. John Wiley & Sons. Chipulu, M., Ojiako, U., Ashleigh, M., & Maguire, S. (2011). An analysis of interrelationships between project management and student‐experience constructs. Project Management Journal, 42(3), 91-101.: 
Crawford, L., Cooke‐Davies, T., Hobbs, B., Labuschagne, L., Remington, K., & Chen, P. (2008). Governance and support in the sponsoring of projects and programs. Project Management Journal, 39(S1), S43-S55.: 
Crawley, E. F., Malmqvist, J., Lucas, W. A., & Brodeur, D. R. (2011). The CDIO syllabus v2. 0. An updated statement of goals for engineering education. In Proceedings of 7th International CDIO Conference, Copenhagen, Denmark. : 
De Graaf, E., & Kolmos, A. (2003). Characteristics of problem-based learning. International Journal of Engineering Education, 19(5), 657-662.: 
Dietrich, S. W., & Urban, S. D. (1998). A cooperative learning approach to database group projects: integrating theory and practice. IEEE Transactions on Education, 41(4), 14-pp.: 
Hamilton, A. (2006, May). Project management: turning engineers into team players. In Proceedings of the Institution of Civil Engineers-Civil Engineering, 159 (2), 82-87.: 
Heer, D., Traylor, R. L., Thompson, T., & Fiez, T. S. (2003). Enhancing the freshman and sophomore ECE student experience using a platform for learning/spl trade. IEEE Transactions on Education, 46(4), 434-443.: 
International Project Management Association. (2015). Individual competence baseline for project, programme & portfolio management. Zurich: Author.: 
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.: 
Kolmos, A., & Kofoed, L. (2002, July). Developing process competencies in cooperation, learning and project management. In Proc. 4th World Conference of ICED.: 
Laloux, F. (2014). Reinventing organizations: A guide to creating organizations inspired by the next stage in human consciousness. Nelson Parker: 
Louw, T., & Rwelamila, P. D. (2012). Project management training curricula at South African public universities: Is the balanced demand of the profession sufficiently accommodated? Project Management Journal, 43(4), 70-80.: 
Pant, I., & Baroudi, B. (2008). Project management education: The human skills imperative. International journal of project management, 26(2), 124-128.: 
Parry, S. B. (1996). Just What Is a Competency? (And Why Should You Care?). Training, 35(6), 58. Project Management Institute. (2017). Project manager competency development framework – Third edition. Newton Square, PA Author.: 
Schmidt, H. G. (1983). Problem‐based learning: rationale and description. Medical education, 17(1), 11- 16: 
Schmidt, H. G. (1993). Foundations of problem‐based learning: some explanatory notes. Medical education, 27(5), 422-432.: 
Takey, S. M., & de Carvalho, M. M. (2015). Competency mapping in project management: An action research study in an engineering company. International Journal of Project Management, 33(4), 784- 796.: 
Thomas, J. W. (1999). Project based learning: A handbook for middle and high school teachers. Buck Institute for Education.: 
Thomas, J. W., & Mergendoller, J. R. (2000). Managing project-based learning: Principles from the field. In Annual Meeting of the American Educational Research Association, New Orleans.: 
Turner, J. R., Keegan, A. E., & Crawford, L. (2002). Delivering improved project management maturity through experiential learning. Project Management, 8(1), 72-81.: 
Van Rooij, S. W. (2009). Scaffolding project-based learning with the project management body of knowledge (PMBOK®). Computers & Education, 52(1), 210-219.: 
Wearne, S. (2004). Professional engineers' needs for managerial skills and expertise. In Proceedings of the Institution of Civil Engineers-Civil Engineering, 157 (1), 44-48.: 
Zhou, C. (2012). Fostering creative engineers: a key to face the complexity of engineering practice. European Journal of Engineering Education, 37(4), 343-353.: 
Go to top